TU Project on Main Branch of Au Sable River
This river restoration project included removing river platforms and replacing them with new structures. New posts were set in place using water pressure to drill holes in the river bottom. On top of the posts, structures were built by repurposing logs and wood from the old platforms. This collaboration inlcuded DNR, summer college interns, and volunteers from TU.